Latest Projects
CONTACT US TODAY
project
LAX Automated People Mover (Design Phase)
scope
During design phase, BCS was tasked to conduct topographic surveys, potholed utility as-built surveys, and professional consulting.
When
2018-2019
client
HDR
project
LA Metropolis High-Rise Development (Construction Phase)
scope
BCS was the Project Surveyor for the General Contractors and performed construction layout, as-built services and provided survey consulting.
When
2016-2019
client
Webcor, Pankow
project
Kaiser South Bay Medical Facility (Construction Phase)
scope
BCS was the Project Surveyor for the General Contractors and performed construction layout, as-built services and provided survey consulting.
When
2013-2017
client
McCarthy
project
Port of Long Beach Middle Harbor Project (Pier E) Phases 1, 2, and 3
scope
BCS was the Project Surveyor for several General Contractors and performed construction layout, as-built services, crane rail certification surveys, Pile-driving survey services and provided survey consulting.
When
2011-Present
client
Manson Construction, Connolly Pacific, Herzog- Reyes, W.E. O’Neil, W.W. Stephenson, Balfour Beatty, Hayward Baker, LBCT, Tesi, Various
project
Alta Loma High School Athletic Facility (Construction Phase)
scope
BCS was the Project Surveyor for the General Contractors and performed construction layout, as-built services and provided survey consulting.
When
2014-2016
client
Tilden-Coil