project
LAX Automated People Mover
(Design Phase)
scope
During design phase, BCS was tasked to conduct topographic surveys, potholed utility as-built surveys, and professional consulting.
When
2018-2019
client
HDR
PROJECT
LA Metropolis High-Rise Development
(Construction Phase)
scope
BCS was the Project Surveyor for the General Contractors and performed construction layout, as-built services and provided survey consulting.
When
2016-2019
clients
Webcor, Pankow
PROJECT
Kaiser South Bay Medical Facility (Construction Phase)
scope
BCS was the Project Surveyor for the General Contractors and performed construction layout, as-built services and provided survey consulting.
When
2013-2017
CLIENT
McCarthy
project
Port of Long Beach Middle Harbor Project (Pier E)
Phases 1, 2, and 3
SCOPE
BCS was the Project Surveyor for several General Contractors and performed construction layout, as-built services, crane rail certification surveys, Pile-driving survey services and provided survey consulting.
When
2011-Present
clients
Manson Construction, Connolly Pacific, Herzog- Reyes, W.E. O’Neil, W.W. Stephenson, Balfour Beatty, Hayward Baker, LBCT, Tesi, Various
project
Alta Loma High School Athletic Facility (Construction Phase)
scope
BCS was the Project Surveyor for the General Contractors and performed construction layout, as-built services and provided survey consulting.
When
2014-2016
client
Tilden-Coil
project
Altman Clinic
(Construction Phase)
scope
BCS was the Project Surveyor for the Steel Contractor and performed construction layout, as-built services and provided survey consulting to the GC.
When
2014-2016
clients
SME Steel
project
Rancho USD Solar Project, Vista USD Solar Project, Fullerton USD Solar Project (Design and Construction phases)
scope
BCS performed topographic base mapping services and construction layout services for dozens school sites for various school districts throughout Southern California.
When
2018-2019
client
Rosendin Electric
project
Tongva Park, Santa Monica
scope
BCS performed construction layout services for utilities, landscape and hardscape improvements in addition to professional survey consulting.
When
2010-2012
client
W.E. O’Neil
project
Christ Cathedral Renovation
scope
BCS was performed As-built survey, construction layout services for the revitalization of the Cathedral, formerly known as the Crystal Cathedral.
When
2018-2019
client
Snyder Langston
project
200 and 400 Spectrum Towers (2 separate construction phases)
scope
BCS was the Project Surveyor for the General Contractor and performed construction layout, as-built services and provided survey consulting throughout the construction process for both projects.
When
2016-2019
clients
Hathaway Dinwiddie